Lane reductions on Highway 174

Please be advised of upcoming lane reductions on Highway 174 westbound between Blair and the Highway 417/174 split, beginning Saturday August 16, for approximately two weeks.

http://ottawa.ca/en/news/lane-reductions-planned-highway-174

This closure is required as part of on-going works for the Highway 417 Expansion project.

Advertisements

Ramp closures and lane reductions

Upcoming ramp closures and lane reductions on Highways 417 and 174

Starting Tuesday, May 20 until Sunday, May 25 there will be off-peak lane reductions on Highway 417 in both directions between Kent Street and the Highway 417/174 split and between Parkdale Avenue and Rochester Street. Hwy 174 westbound will also be subject to off-peak lane reductions between Montreal Road and Blair Road.

In addition to the above lane reductions, the following ramp closures will occur:

  • The southbound Vanier Parkway on-ramp to Hwy 417 eastbound is closed until Friday, May 30. Please follow the signed detour route on Terminal Avenue.
  • The southbound St. Laurent Boulevard on-ramp to Hwy 417 eastbound will be closed nightly from Monday, May 19 until Saturday, May 24.
  • The southbound Vanier Parkway on-ramp to Hwy 417 westbound will be closed nightly from Monday, May 19 until Saturday, May 24.
  • The northbound St. Laurent Boulevard on-ramp to Hwy 417 westbound will be closed nightly from Monday, May 19 until Saturday, May 24.
  • The westbound Hwy 417 off-ramp to the Vanier Parkway will be closed overnight, Wednesday, May 21 and Thursday, May 22.
  • The southbound St. Laurent Boulevard on-ramp to Hwy 417 westbound will be closed nightly from Monday, May 19 until Saturday, May 24.

Signage will be in place to advise drivers of these traffic and road changes. Motorists are also reminded to respect the reduced speed limits and use caution when travelling through construction zones. Many of these construction elements are weather-dependant and may be implemented later than the dates given above.

This work is being done as part of the Highway 417 expansion project, which began in May 2013, and will add an additional lane in each direction between Nicholas Street and the Split. The additional lane will be used for bus rapid transit during the 2015 to 2018 phase of the Confederation Line construction.

Ramp closures and lane reductions

Upcoming ramp closures and lane reductions on Highways 417 and 174

Ottawa – Starting Sunday, March 30 until Sunday, April 6 there will be off-peak lane reductions on Highway 417 in both directions between Kent Street and the Highway 417/174 split and between Parkdale Avenue and Rochester Street. Hwy 174 westbound will also be subject to off-peak lane reductions between Montreal Road and Blair Road.

In addition to the above lane reductions, the following ramp closures will occur:

  • The southbound St. Laurent Boulevard on-ramp to Hwy 417 eastbound will be closed nightly from Sunday, March 30 until Saturday, April 5.
  • The northbound St. Laurent Boulevard on-ramp to Hwy 417 westbound will be closed nightly from Sunday, March 30 until Saturday, April 5.

Signage will be in place to advise drivers of these traffic and road changes. Motorists are also reminded to respect the reduced speed limits and use caution when travelling through construction zones. Many of these construction elements are weather-dependant and may be implemented later than the dates given.

This work is being done as part of the Highway 417 expansion project, which began in May 2013, and will add an additional lane in each direction between Nicholas Street and the Split. The additional lane will be used for bus rapid transit during the 2015 to 2018 phase of the Confederation Line construction.

With all of the construction-related activities underway, residents are encouraged to be flexible with commuting times, stagger work hours or use other alternative means for travel. The public is asked to consider options such as transit, walking, cycling or carpooling.

The City of Ottawa has tools on ottawa.ca to help motorists and transit users plan their routes and manage their commute including:

OttawaNav – the City’s mobile application for real time construction and traffic information.

City of Ottawa Traffic Report – outlining citywide road closures, traffic restrictions and detours

Travel Planner at octranspo.com – transit users can chart and plan routes

Interactive traffic map – showing construction areas and live traffic cams throughout the city

Ministry of Transportation of Ontario (MTO) cameras along Highway 417

Cycling maps and information – detailing bicycle pathways and lanes throughout the city

Further details and other information concerning City road works are available on ottawa.ca.

Fermetures de bretelles et réductions de voies prochaines sur l’autoroute 417 et la route 174

Ottawa – À partir du dimanche 30 mars et jusqu’au dimanche 6 avril, le nombre de voies sur l’autoroute 417 sera réduit dans les deux directions en dehors des heures de pointe, entre la rue Kent et l’embranchement de l’autoroute 417 et de la route 174, ainsi qu’entre l’avenue Parkdale et la rue Rochester. Le nombre de voies sera également réduit sur la route 174 en direction ouest, entre les chemins de Montréal et Blair, en dehors des heures de pointe.

En plus des réductions de voies mentionnées ci-dessus, les bretelles suivantes seront fermées :

·         la bretelle d’accès à l’autoroute 417 en direction est en provenance du boulevard St-Laurent en direction sud sera fermée pendant la nuit, du dimanche 30 mars au samedi 5 avril;

·         la bretelle d’accès à l’autoroute 417 en direction ouest en provenance du boulevard St-Laurent en direction nord sera fermée pendant la nuit, du dimanche 30 mars au samedi 5 avril.

Des panneaux de signalisation informeront les conducteurs des changements apportés à la circulation et aux configurations routières. On rappelle aux automobilistes de respecter les limites de vitesse réduites et de conduire avec prudence dans les zones de construction. Nombre de ces travaux sont tributaires des conditions météorologiques et pourraient être effectués plus tard que les dates indiquées.

Ces travaux sont effectués dans le cadre du projet d’élargissement de l’autoroute 417, qui a commencé en mai 2013, et qui ajoutera une voie supplémentaire dans chaque direction entre la rue Nicholas et la jonction avec la route 174. Les voies supplémentaires serviront au transport rapide par autobus pendant la construction de la Ligne de la Confédération de 2015 à 2018.

Durant tous ces travaux de construction, on invite les résidents à faire preuve de flexibilité pour calculer leurs temps de déplacement, à décaler leurs heures de travail ou à utiliser d’autres moyens de transport. On demande au public d’envisager d’autres moyens de se déplacer, comme le transport en commun, la marche, le vélo ou le covoiturage.

La Ville d’Ottawa dispose d’outils sur ottawa.ca pour aider les automobilistes et les usagers du transport en commun à planifier leur trajet et à gérer leurs déplacements.

OttawaNav – application mobile de la Ville fournissant des renseignements en temps réel sur les travaux et la circulation.

Le Rapport de circulation de la Ville d’Ottawaprécise les fermetures de routes, les restrictions en matière de circulation et les déviations à l’échelle de la ville.

Le planificateur de trajet à octranspo.com – aide les usagers du transport en commun à préparer et planifier leur itinéraire.

La carte de circulation interactive – indique les secteurs où ont lieu des travaux de construction et la liste des caméras vidéo de circulation de la ville.

La liste des caméras vidéo de circulation du ministère des Transports de l’Ontario le long de l’autoroute 417.

La carte des pistes cyclables et renseignements connexes – repère toutes les pistes et les voies cyclables dans la ville.

On trouvera de plus amples renseignements sur les travaux routiers de la Ville à l’adresse ottawa.ca.